Computer Science > Data Structures and Algorithms
[Submitted on 4 Jul 2021]
Title:Closing the gap for single resource constraint scheduling
View PDFAbstract:In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is feasible if, at each point in the schedule, the number of machines and resources required by jobs processed at this time is not exceeded. It is NP-hard to approximate this problem with a ratio better than $3/2$. On the other hand, the best algorithm so far has an absolute approximation ratio of $2+\varepsilon$. This paper presents an algorithm with absolute approximation ratio~$(3/2+\varepsilon)$, which closes the gap between inapproximability and best algorithm except for a negligible small~$\varepsilon$.
References & Citations
Bibliographic and Citation Tools
Bibliographic Explorer (What is the Explorer?)
Litmaps (What is Litmaps?)
scite Smart Citations (What are Smart Citations?)
Code, Data and Media Associated with this Article
CatalyzeX Code Finder for Papers (What is CatalyzeX?)
DagsHub (What is DagsHub?)
Gotit.pub (What is GotitPub?)
Papers with Code (What is Papers with Code?)
ScienceCast (What is ScienceCast?)
Demos
Recommenders and Search Tools
Influence Flower (What are Influence Flowers?)
Connected Papers (What is Connected Papers?)
CORE Recommender (What is CORE?)
arXivLabs: experimental projects with community collaborators
arXivLabs is a framework that allows collaborators to develop and share new arXiv features directly on our website.
Both individuals and organizations that work with arXivLabs have embraced and accepted our values of openness, community, excellence, and user data privacy. arXiv is committed to these values and only works with partners that adhere to them.
Have an idea for a project that will add value for arXiv's community? Learn more about arXivLabs.